DOT&PF > Central Region > Projects > Sterling Highway MP 45-60 Project > Project Documents
Document Library
Current project documents are included here. See “Document Library Archive” for a list of historical documents.
Adobe Acrobat Reader is required to view the PDF documents on this page. To download a free version, visit https://get.adobe.com/reader.
Current Financial Plan and Annual Agreement
Updated Maps
Western Intersection Selected Alignment
West End – Phase 1A
- MP 56–58, 100% design (construction began in 2021. This scope of work will be added to the Phase 3 & 4 grading and drainage project. This erosion repair work is anticipated to occur in Spring 2024.)
Off Alignment – Phase 2-6 Map – LARGE FILE
- New highway, 95% design; shows more detailed structures, intersections, trailheads, with updated aerial imagery from the 2021 construction season.
East End – Phase 1B – LARGE FILE
- MP 45–47, 95% design (construction is anticipated to begin in 2024 and be completed in 2026)
To view a list of past project related documents, public involvement efforts, technical documents and more, visit the Project Archives page.
Project Information
For the latest construction updates, visit the Sterling Highway Construction Website.