Skip to content

Document Library

Adobe Acrobat Reader is required to view the PDF documents on this page. To download a free version, visit  https://get.adobe.com/reader.

UPDATED MAPS

Western Intersection Selected Alignment

West End – Phase 1A

MP 56–58, 100% design, construction began in 2021 and will continue through 2022.

Off Alignment – Phase 2-6 Map

New highway, 95% design; shows more detailed structures, intersections, trailheads, with updated aerial imagery from the 2021 construction season.

East End - Phase 1B

MP 45–47, 95% design (construction is anticipated to begin in 2024 and be completed in 2026)

 

Public Open House Materials

August 24, 2021, Fall Online and In-person Public Meeting Materials

 

October 22, 2020, Online Fall Public Meeting Materials:

February 25, 2020, Public Meeting

October 29, 2019, Public Meeting

Project Updates

Design Phase

Documents developed during the design phase are posted here when available.

Other Project-Related Documents

Environmental Phase

Visit archived pages related to the EIS using the links below.

Archived Documents

The links below cover documents that were developed prior to the current design stage. Click on the titles to explore the alternatives considered, impacts and benefits anticipated, and approved mitigation measures. There are also links to early engineering studies.